Telegram游戏群www.tel8.vip)是一个Telegram群组分享平台。Telegram游戏群包括Telegram群成员导出、telegram群组索引、Telegram群组导航、新加坡telegram群组、telegram中文群组、telegram群组(其他)、Telegram 美国 群组、telegram群组爬虫、电报群 科学上网、小飞机 怎么 加 群、tg群等内容。Telegram游戏群为广大电报用户提供各种电报群组/电报频道/电报机器人导航服务。

More than 100 Petaling Jaya residents gathered last Saturday to protest the construction of the proposed PJD Link highway. – The Malaysian Insight file pic, July 5, 2022.

THE approval given to the proposed Petaling Jaya Dispersal Elevated Highway (PJD Link) project is subject to further negotiations, the Works Ministry said.

In a statement, it said that the project was approved in principle by the cabinet on November 12, 2017 and a concession agreement was signed last April 5, which requires the developer to fulfil Environmental Impact Assessment (EIA), Social Impact Assessment (SIA) and Traffic Impact Assessment (TIA) requirements before construction could begin.

The ministry added that the proposed project was also approved in principle by the Selangor government on September 3, 2020 at the Selangor State Economic Action Council (MTES) meeting.

“The main objective of PJD Link is to disperse traffic congestion in Petaling Jaya by providing major connections with existing roads and highways.

,

足球博彩平台www.hg108.vip)是一个开放皇冠即时比分、代理最新登录线路、会员最新登录线路、皇冠代理APP下载、皇冠会员APP下载、皇冠线路APP下载、皇冠电脑版下载、皇冠手机版下载的皇冠新现金网平台。足球博彩平台上登录线路最新、新2皇冠网址更新最快,足球博彩平台开放皇冠会员注册、皇冠代理开户等业务。

,

“This project involves connectivity with six existing highways and five major railways to achieve the objective of dispersing the traffic,” it said.

The statement was issued in response to concerns raised by Petaling Jaya residents over the construction of the proposed highway last Saturday.

The ministry said that the proposed PJD Link project had taken into account its connectivity with the public transport system and that engagement sessions had been held with the Transport Ministry and the Land Public Transport Commission (SPAD).

“Taking into account the feasibility input from the relevant agencies and authorities, PJD Link has been listed as a potential highway project to be implemented through privatisation in the Highway Network Development Plan (HNDP) 2030 and its planning has been taken into account in the local plans of relevant local government authorities.

“The Malaysian Highway Authority and the developer are also prepared to hold engagement sessions with residents’ associations and local leaders to provide information and answers to issues that may arise from the implementation of this project,” it said. – Bernama, July 5, 2022.


转载说明:本文转载自Sunbet。 Usdt自动充值接口声明:该文看法仅代表作者自己,与本平台无关。转载请注明:Telegram游戏群(www.tel8.vip):PJD Link approval subject to further negotiations, says Works Ministry
发布评论

分享到:

菲律宾博彩网址(www.99cx.vip):十年来逾1800项海外流失文物回归中国
1 条回复
  1. 皇冠app下载(www.hg108.vip)
    皇冠app下载(www.hg108.vip)
    (2022-10-04 00:13:02) 1#

    可以让自己不那么尴尬。最后,若是你想展望未来,好比:“在以后的学习和生涯中,我会更进一步,永远朝着目的起劲!”注重自我评估,不要老说自己,要适当总结先生、同砚、家长的辅助和支持,不会太单调。但最主要的是要体面!不要太张扬自己的优点,也不要太自卑,这需要凭据现实来掌握。恨不早点看见!

发表评论

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。